Home About Us Services ↳ Canada PR Visa (Permanent Residency) ↳ Work Permit Canada ↳ LMIA — Labour Market Impact Assessment ↳ Spouse & Family Sponsorship Visa ↳ Student Visa Canada ↳ Visitor Visa ↳ Business Visa Provinces ↳ 🏙️ Ontario ↳ 🏔️ British Columbia ↳ 🌾 Alberta ↳ 🌻 Saskatchewan ↳ 🌊 Manitoba ↳ ⚓ Nova Scotia ↳ 🍁 New Brunswick ↳ 🦞 Prince Edward Island ↳ 🐟 Newfoundland & Labrador ↳ 🌊 Atlantic Immigration Program Healthcare Blog FAQ Careers Canada Contact

Chaudière Crossing: Southern Structures Renewal Project

We are working on a project to renew the Chaudière Crossing’s southern structures to make them safer and more reliable for current and future generations.

Project overview

Location
National Capital Region
Type of project
Replacement and rehabilitation
Lead department
Public Services and Procurement Canada
Project status
Construction

Project description

The Chaudière Crossing, the oldest crossing in the National Capital Region, is a critical link between Ottawa, Ontario, and Gatineau, Quebec. It is a complex infrastructure asset consisting of 8 structures and is among the 2 interprovincial truck routes.

The southern structures are designated as lifeline bridges, vital for the integrity of transportation for island residents and essential for emergency services access. These structures must remain in good condition at all times. They must resist potential earthquakes and other potential natural disasters. They also must ensure continuous service to residents, businesses and emergency responders.

Recent inspections and studies indicate that parts of the southern structures were found to be in poor condition. Repairs and replacement are needed to keep the crossing safe for users.

The Southern Structures Renewal Project will include replacement and rehabilitation work on the Bronson Channel Bridge, the Ottawa Hydro Electric Power Commission Channel Bridge and the Buchanan Channel Culvert. The work is anticipated to provide a minimum lifespan of 75 years for the replaced structures.

Image of the 8 structures of the crossing highlighting the southern structures, which are located on Booth Street in Ottawa
8 structures of the crossing highlighting the southern structures

The project scope includes work on the following structures:

Bronson Channel Bridge

The work on the superstructure and substructure elements includes:

  • replacing the deck, sidewalks and cycle tracks, barriers, pedestrian railings, pier and street lights
  • constructing new abutments behind the existing abutments
Ottawa Hydro Electric Power Commission Channel Bridge

The superstructure will be replaced, including the:

  • deck
  • sidewalks and cycle tracks
  • barriers
  • pedestrian railings
  • street lights

The work on the substructure components includes:

  • rehabilitating the abutments and bearing seats
  • replacing all bearings
Buchanan Channel Culvert

The work on the Buchanan Channel Culvert includes:

  • rehabilitating the retaining walls and headwalls sidewalks and barrier walls
  • installing new pedestrian railings and new street lights

Key milestones

The structures have deteriorated over time. Based on risk and cost analyses, it was decided to advance rehabilitation and replacement work on the 3 structures to keep the crossing safe. The following timeline outlines the key milestones for the Southern Structures Renewal Project:

  • 2021 to 2023: Structural evaluations, a feasibility study and a concept design were completed to assess options for rehabilitation or replacement of the 3 structures
  • Summer 2024: A contract was awarded to Parsons Inc. for professional engineering services, including the detailed design of the Southern Structures Renewal Project
  • Winter 2025 to 2026: A construction management contract was awarded to Pomerleau Inc.
  • Spring 2026: Construction work began
  • Summer 2028: Construction is expected to be completed

Impact on traffic and active transportation

PSPC is working in close coordination with the Alexandra Bridge Replacement Project to minimize transportation network impacts across the National Capital Region. Construction work is underway and will continue into summer 2028. Two lanes of traffic are anticipated to remain open throughout construction, with one lane available in each direction at a reduced width. The full width of the crossing is expected to reopen to traffic in summer 2028. However, for a few sensitive or higher-risk activities, temporary full closures of the crossing may be required, typically scheduled overnight or on weekends to minimize disruption

We will provide information to commuters before work starts so they can consider alternative routes during construction periods. Stay informed about lane closures by following us on social media or visiting our web page on lane reductions and closures on interprovincial bridges in the National Capital Region.

Related links

Page details

2026-07-31

Quick Enquiry

We usually reply within a few hours
By submitting you agree to be contacted about your enquiry.
Call us Chat on WhatsApp
M

Migova AI Assistant

Online now
Hi 👋 I'm the Migova AI assistant, powered by OpenAI. Ask me about PR, study visas, work permits, LMIA, family sponsorship, provinces, or healthcare immigration to Canada.
Canada PR
Study Visa
LMIA / Work Permit