Home About Us Services ↳ Canada PR Visa (Permanent Residency) ↳ Work Permit Canada ↳ LMIA — Labour Market Impact Assessment ↳ Spouse & Family Sponsorship Visa ↳ Student Visa Canada ↳ Visitor Visa ↳ Business Visa Provinces ↳ 🏙️ Ontario ↳ 🏔️ British Columbia ↳ 🌾 Alberta ↳ 🌻 Saskatchewan ↳ 🌊 Manitoba ↳ ⚓ Nova Scotia ↳ 🍁 New Brunswick ↳ 🦞 Prince Edward Island ↳ 🐟 Newfoundland & Labrador ↳ 🌊 Atlantic Immigration Program Healthcare Blog FAQ Careers Canada Contact

Burlington Canal Lift Bridge: Bridge deck replacement project

Find out about the deck replacement project for the existing Burlington Canal Lift Bridge.

Project overview

Location

Burlington, Ontario
Locate the Burlington Canal Lift Bridge on a map

Type of project

Replacement

Lead department

Public Services and Procurement Canada

Design and engineering consultant

AECOM Canada Ltd.

Construction manager

EllisDon Civil Ltd. and Chant Ltd., in joint venture

Project cost

$32.5 million

Project status

Completed

Project description

About the bridge

The Burlington Canal Lift Bridge provides access to thousands of motorists and pedestrians entering Hamilton Harbour.

Replacement project

This project involved replacing the existing bridge deck. The 3 main objectives for this project are described below:

  • to replace the lift span deck
  • to rehabilitate the approach spans
  • to widen sections of the sidewalk, in order to provide sufficient width for pedestrians and cyclists to both pass safely

It is anticipated that this project will extend the life of key components of the bridge by approximately:

  • 50 years for the deck and sidewalk
  • 30 years for the approaches

This project will improve the overall operations of the bridge, extend its lifespan and ensure the continued safety of bridge users.

The design and engineering tender was posted on buyandsell.gc.ca in early November 2021 and closed on December 21, 2021. The design and engineering contract was awarded to AECOM Canada Ltd. on January 21, 2022.

The construction management tender was posted on buyandsell.gc.ca on April 12, 2022, and closed on June 3, 2022. The construction management contract was awarded to EllisDon Civil Ltd. and Chant Ltd., in joint venture, on June 21, 2022.

Project phases

The 2 phases of this project are described below.

Phase 1: Removing and replacing the existing bridge deck

Phase 1 of the project included replacing the lift span deck.

This work began during the winter 2022 to 2023 seasonal shutdown (late December 2022 to March 2023) and continued through the rest of 2023.

Work accelerated during the winter 2024 seasonal shutdown (January to March 2024) and was completed in time to reopen for marine navigation.

A bridge closure was required from January to March 2024 to complete phase 1 of the project, replacing the lift span deck, and to begin phase 2, rehabilitating the approach spans. During this time, the bridge was closed to motorists, cyclists and pedestrians.

Phase 2: Rehabilitating the bridge approach spans and widening localized sections of the sidewalk

Phase 2 of the project began during the winter 2024 seasonal shutdown (January to March 2024) and continued into fall 2024.

The work included:

  • rehabilitating the approach spans
  • removing the concrete decks
  • rehabilitating the existing structural steel.

Photo gallery

Select the image to view a larger version.

View enlarged image of the west side of the lift span deck is being replaced on the Burlington Canal Lift Bridge
View enlarged image of the decking on the Burlington Canal Lift Bridge is being bolted down and the vehicular barrier is being installed
View enlarged image of the asphalt being removed to prepare for demolition on the south approach of the Burlington Canal Lift Bridge
View enlarged image of the newly replaced steel grating, supporting steel beams and vehicular barriers along the east and west sides of the lift span
View enlarged image of the existing concrete decks and steel beams were rehabilitated. New concrete decks were constructed, along with new vehicular barriers
View enlarged image of the sidewalk on the west side of the bridge was widened to ensure 1.5 metres for wheelchair access

Key milestones

  • January 2020: start project preplanning and stakeholder consultations
  • January 2022: award design and engineering contract
  • June 2022: award construction management contract
  • Winter 2023: start construction for phase 1
  • Winter 2024: complete construction for phase 1 and start construction for phase 2
  • Fall 2024: complete construction for phase 2
  • Fall 2024: complete project

Project background

Engaging with stakeholders

In early 2020, we started work on a concept design to replace the bridge deck. While developing the preliminary design, we advised and consulted with the key stakeholders affected by the project:

  • Ontario Ministry of Transportation
  • Cities of Hamilton and Burlington
  • Hamilton-Oshawa Port Authority

We ensured that stakeholders were regularly consulted throughout the planning process.

Initial meetings with stakeholders were held in May and July 2021.

Latest news about this project

July 7, 2022: Government of Canada awards construction management contract for Burlington Canal Lift Bridge deck replacement

Related links

Page details

2025-09-11

Quick Enquiry

We usually reply within a few hours
By submitting you agree to be contacted about your enquiry.
Call us Chat on WhatsApp
M

Migova AI Assistant

Online now
Hi 👋 I'm the Migova AI assistant, powered by OpenAI. Ask me about PR, study visas, work permits, LMIA, family sponsorship, provinces, or healthcare immigration to Canada.
Canada PR
Study Visa
LMIA / Work Permit